Olympic cost over-runs infographic
- Állapot: Closed
- Díj: $75
- Beérkezett pályamű: 8
- Nyertes: richardwct
A verseny összegzése
I need an infographic about the potential 2026 Calgary Olympic winter games bid. I'd like to use some stylized cartoon-ish graphics of Calgary, Canada landmarks in the background and/or olympic sport cartoon-ish graphics and then show the cost overruns from the last 10 winter olympics as detailed on table 3 in this report: http://eureka.sbs.ox.ac.uk/6195/1/2016-20.pdf
Maybe a bar chart or some other visualization of the cost overruns.
And maybe stick Calgary in there with a question mark next to it.
Size of the graphic should be 5" x 6.7" and high dpi suitable for print.
Ajánlott készségek
Munkaadói értékelés
“Really nice work and fixed issues quickly. ”
TaxpayerDOTcom, Canada.
A verseny legjobb pályaművei
-
richardwct Malaysia
-
richardwct Malaysia
-
mishrapeekay India
-
mishrapeekay India
Nyilvános pontosítófelület
Így vágjon bele a versenyekbe
-
Indítson egy versenyt! Gyors és könnyű
-
Kapjon akár több száz pályaművet A világ minden szegletéből
-
Díjazza a legjobb pályázatot Töltse le a fájlokat - csak egy kattintás!