Concrete Road construction inside a factory

₹37500-75000 INR

Lezárt
Kiadva ekkor: több mint 6 évvel ezelőtt

₹37500-75000 INR

Teljesítéskor fizetve
Planning road construction inside factory premises. Close to 2500 sq. mtr of concrete road and approx. 2000 sq. mtr of paver block road. Need a civil engineer for overlooking the work. Around 2 to 3 months of work.
Projektazonosító: 15700549

A projektről

5 ajánlat
Távolról teljesíthető projekt
Aktiválva: 6 évvel ezelőtt

Szeretne pénzt keresni?

A Freelancer oldalán történő árajánlatadás előnyei

Határozzon meg költségvetést és időkeretet
Kapja meg fizetését a munkáért
Vázolja ajánlatát
Ingyen regisztrálhat és adhat árajánlatot munkákra
5 szabadúszó adott átlagosan ₹59 944 INR összegű árajánlatot erre a munkára
Felhasználó avatár
Hi, I am Vincent, a civil engineer by profession. I can help you with the assignment. Kindly allow me to discuss the project with you. Regards Relevant Skills and Experience Civil engineer Proposed Milestones ₹83333 INR - NEGOTIABLE
₹83 333 INR 3 napon belül
5,0 (13 értékelés)
3,9
3,9
Felhasználó avatár
A proposal has not yet been provided
₹41 666 INR 10 napon belül
0,0 (0 értékelés)
0,0
0,0
Felhasználó avatár
A proposal has not yet been provided
₹62 222 INR 100 napon belül
0,0 (0 értékelés)
0,0
0,0
Felhasználó avatár
I was working with the Department of Public Works and Highways in our country as project engineer in various projects, roads, drainage, shore protection, school buildings, multi-purpose building, bridges..etc., my short construction methodology are as follows; 1. A survey should be conducted to be precise of the project limits and contours. 2. Layout will be conducted in preparation for the sub-base and base coarse aggregates, any downgrade area should be filled to attain the specifications of the design. 3. After all cuts and fills are accomplished, a sub-grade aggregates will be spread on the area to be cemented, in which a compaction will be conducted to attain a 95% to 100% compaction. 4. After the compaction of the sub-grade is attained, a base coarse aggregates will be spread, depending on the specified thickness, and compaction will be conducted to attain the 95% to 100% compaction. 5, A field density test will be conducted, to assure the base aggregates are fully compacted and are ready for concrete pouring, this will depend on the design of the concrete and thickness. 6. A mock-up will be conducted in the project area, and a concrete cylinder will be made for compression test on specified number of days. 7. If the concrete requires for a reinforcing bars, a design will be submitted with the bar sizes. But with the construction joints, it is required to install reinforcing bars to connect the concrete with maximum adhesiveness.
₹62 500 INR 20 napon belül
0,0 (0 értékelés)
0,0
0,0

Az ügyfélről

INDIA zászlója
India
0,0
0
Tagság kezdete: nov. 22, 2017

Ügyfél-hitelesítés

Köszönjük! E-mailben elküldtük a linket, melyen átveheti ajándék egyenlegét.
E-mailje elküldése során valami hiba történt. Kérjük, próbálja újra.
Regisztrált Felhasználók Összes Közzétett Munka
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Előnézet betöltése
Hozzáférést adott a helymeghatározáshoz.
Belépési munkamenete lejárt, és kijelentkeztettük. Kérjük, lépjen be újra.