Create a Construction Schedule
$30-250 USD
Kiszállításkor fizetve
I need a small "real" construction network schedule. Ideally, the schedule would fit onto one page and be approximately 18 - 20 activities. This must be a network schedule, so when teaching I can show the forward pass, backward pass, free float, total float, and lag time. I am attaching a blank schedule, which I currently use. However I want a real life example. Any small, "real" project so I can demonstrate a real-life example to the class.
Projektazonosító: #18532919
A projektről
8 szabadúszó tett átlagosan 105$ összegű árajánlatot erre a munkára
hi i can finish your project i m very clever in this field .....i did many projects like your project .... i am a civil engineer and teaching assistant in faculty of engineering @ national water research cent Továbbiak
Dear, Sir. Here is my profile and portfolio link. https://www.freelancer.com/u/yongjun514 I have read your project descriptions carefully. So I think I can complete it successfully in your timeline. If you hire m Továbbiak
Goodnight I am interested in carrying out this project. I have more than 11 years of experience in the Project Planning area and I have a "real" and simple project proposal; It is a power line. For more details, Továbbiak
I'm Civil Engineering and that is one of the work of a civil Engineer. I can give you construction schedule depend on what format you want. I guaranteed you that I will do my very best if you'll hire me in this project
I am an electrical engineer with 6 years field experience in Mega Projects(5B$+). My experience covers power distribution, control, lighting, ddc(hvac control), bms, ccms, fire alarm and data. I am also a Leed Green As Továbbiak
I am a civil engineer. I am working as project manager in a construction company. I can prepare you a brief schedule of my project, that will help you in every aspect.
Hi, I allready have Visio file wich I use a few month ago. I just have to trasnlate it. It´s about a water conduction project in Jujuy, Argentina. I hope you like the idea. Regards