To whom it may concerns,
Let me introduce myself who had an experiences of large size of EPC project in middle as E&I QM manager for inspection & test, E&I construction manager for electrical installation.
The size of power plant was more than 1.5b USD including 400KV GIS, 380KV GIS and 154KV transmission line.
I had an experience of inspection and test of 380KV Thoshiba GIS which was consist of 26 Bay in Saudi Arabia and 400KV ABB GIS which was consist of 24 Bay in Kuwait.
And experiences of Installation and inspection for high/low voltage of SWGR, MCC, electrical equipment and field instruments and cable installation/testing would be important for your requirement
Thanks
N K Yang.