Operations Research Code for Maximizing Output -- 2
$30-250 USD
Teljesítve
Kiadva ekkor: több mint 6 évvel ezelőtt
$30-250 USD
Teljesítéskor fizetve
Taking into Consideration the following constraints,
Electrical Consumption,
Labor Available,
Resources Available (Raw Materials, Packaging Materials...)
Hours Available,
Desired outcome is to create a schedule, considering all the above constraints, especially a constrained electrical consumption, while taking into consideration the lead time of machinery, and cooling of products, while maximizing the total output of the industry.
The industry is a chocolate factory that has major constraints.
Hello – I am having a PhD in engineering from a top university and have 15 years’ experience in solving optimization problem. I will use EXCEL to solve your problem.
I am highly qualified for this project and would like to speak with you further about taking this project on. If you'd like to view my previous work, take a look at my Freelancer Portfolio.
Thanks.